標題: Wholesale China Jerseys Bharat Dindyal
無頭像
yueyrt1py8
『花海』會員
Rank: 1

帖子 22495
註冊 2017-9-13
用戶註冊天數 2417
狀態 離線
發表於 2018-4-26 15:51 
36.57.181.74
分享  私人訊息  頂部
The Guyana Power and Light Inc. (GPL) is in talks with the state’s sugar company to manage three W?rtsil? generators at the Skeldon factory.The operation of the three engines, part of a co-generation facility built into the multi-million-US-dollar Skeldon factory, had come sharply into focus after blackouts in Berbice.The Guyana Sugar Corporation (GuySuCo) had been managing the engines,Cheap Jerseys Wholesale, which have a 10-megawatt capacity,Cheap Jerseys Free Shipping, but because of that company’s cash-strapped situation, maintenance had been aGPL is in talks with GuySuCo to manage the W?rtsil? engines at the Skeldon factory.sore issue.The co-generation facility comprises two 15-megawatt turbine steam engines which use bagasse (remains of the crushed sugarcane) and three W?rtsil? generators with a 10-megawatt capacity. It was built with the intention of boosting GPL’s capacity in Berbice. The turbines would operate during crop while the W?rtsil? engines kick in at other times. However,NFL Jerseys From China, there has been worry that the W?rtsil? engines which require scheduled maintenance,Cheap NFL Jerseys China, were not receiving the necessary attention.The largest of the W?rtsil? engines,Cheap NFL jerseys China, some five-megawatts, went down after an alternator blew last year. Poor maintenance has been blamed.Under arrangements,NFL Jerseys China, GPL would provide fuel to GuySuCo to produce power year round.Questioned about reports that GPL will be moving to maintain the W?rtsil? sets, Chief Executive Officer, Bharat Dindyal, disclosed that the Government has approved of talks between the two state entities to make this a reality.Kaieteur News understands that current GuySuCo staffers may be trained by W?rtsil? to operate the engines, as part of the recommendations made.GPL has been speaking about the increasing challenges it has been facing as a result of growing demands. A major programme to build new transmission lines, via a US$38M Chinese loan, is underway. A 26-megawatt W?rtsil? plant is also under construction at Vreed-en-Hoop.It is the intention to fully link Demerara and Berbice into an integrated system also under construction.